8th grade in the field of building and construction
Entering the construction of industrial projects
Coke production, Iron equilibrium plantZarand Coke production plant – Industrial part – KermanZarand Coke production plant – None-industrial part – Kerman
1st grade in the field of installation and equipment
Establishment of Sazvar-Sazeh Azarestan
Establishment of Rooja Tejarat Azarestan
Entering the Plant construction projects
Coal-fired power plant of Tabas
Beginning of Soil Stabilization projects
Importing the soil stabilization machinery
Entering the construction of high-rise buildings
Increasing capital up to 500 billion Rials.
Obtaining the HSE excellence certificate
Establishment of the subsidiary company in Russia
Establishment of Emaarat Pishgam Azarestan
3000 personnel
1000 billion Toman registered capital of ABD
Entering the mining construction projects.
Baspar Pey Iranian Company joined Azarestan Business Development Group.